Your office in Cardiff is being fitted out, or has just been, and the walls need painting.
This page shows how the painting is planned around the other trades and your staff, so you get a clear written quote.
- How Is Office Decorating Planned Around Your Staff and Opening Hours?
- When Should Painting Happen During an Office Fit-Out?
- How Are Changes, Small Faults and Handover Recorded?
Primrose Decor connects people in Cardiff with a trusted local decorator. Call 029 2271 0084 and ask about redecorating your Cardiff office in stages around your staff.
Why Choose Us
Why Choose Primrose Decor
Your Office First
The plan starts with how your office runs, not with a standard schedule. A named contact agrees staffing, opening hours and client visits with you first.
One Point of Contact
That contact stays your single point of contact throughout, so any change is agreed with them.
Written Specification
A written specification lists the surfaces, the preparation, the paint, access, protection, timing and anything left out.
Written Handover
Any changes to the job and any small faults are written down and agreed before handover.
Office Fit-Out
When Should Painting Happen During an Office Fit-Out?
In an office fit-out, the painting has to fit in between the other trades. Dusty jobs, such as ceiling work and cutting into walls, are usually finished first. The walls are then painted before new flooring, screens and furniture go in, or those items are covered.
Other trades often scuff fresh paint as they finish. Plan a short touch-up visit for after they leave, and agree with the fit-out contractor who protects the floors and fitted items until then.
If the office is already fitted out and you only want it painted, the same questions apply, with less to work around.
Planning Around Staff
How Is Office Decorating Planned Around Your Staff and Opening Hours?

Once the fit-out plan is clear, the decorating plan starts with how your office runs, not with a standard schedule. One named contact agrees your staffing, opening hours and any client visits with you before a date is fixed.
That person stays your single point of contact throughout. Any change is agreed with them, not left to the decorator to decide on site.
Areas To Phase
Which Parts of the Office Should Be Painted First?
Start with the areas your staff and visitors see and use most. That usually means reception, meeting rooms and the main corridors.
Then mark each area as cleared, partly in use or still in use. That list sets the order of work, so nobody is guessing on the day.
Which Paint Finishes Suit Desks, Corridors and Shared Spaces?

The finish depends on the surface and on how many people use the space, not on one “commercial” paint used everywhere. Corridors and shared spaces need a tough finish that can be wiped clean. Private offices can often use a lighter-duty finish.
Desks, partitions and fixed furniture must be covered or moved before any preparation starts. Agree who does that before the timing is set.
Once the finishes are chosen, Primrose Decor can connect you with a local decorator who works on offices in Cardiff.
Walls and ceilings inside the office follow the same steps as interior painting at home.
Send Us Your Office Details
Tell us about your office access and finishes and get a written quote
Out Of Hours
Can the Work Be Done in the Evenings or at Weekends?
Sometimes, but it depends on the decorator’s diary and on your building’s own rules. Some offices allow evening or weekend access, and others do not.
Raise this early rather than assuming it. Get the exact hours confirmed in writing before you agree a start date.
A shop job has its own timing questions. See shopfront painting in Cardiff.
The Specification
What Should a Written Office Decorating Specification Say?

A written specification is a document that says exactly what the job includes. It lists the surfaces and how each one is prepared. It also names the paint and covers access, protection, timing and anything left out.
Without these details, too much is left open to interpretation once work starts. Ask for the specification in writing before you agree a date.
The same applies to any commercial painting job.
Confirm With The Occupier
What Should You Check With Your Building Manager Before Planning Starts?
If your office is in Cardiff’s Central Enterprise Zone, the building will have its own rules. Cardiff Council describes the zone as a 140-acre business district, and each building in it can set different rules for contractors.
Primrose Decor connects Cardiff offices with a local decorator.
What Do You Need to Tell the Decorator About Staff and Tenant Access?
Tell the decorator how many staff are in the building and which routes other tenants use. Pass on any shared-building rules too. Settle this before the job is planned, not after work has started.
Is Out-of-Hours Access Available for Your Office?
A Grade-A building sets its own rules on out-of-hours access. Check with your building manager rather than assuming the whole zone works the same way.
Variations And Handover
How Are Changes, Small Faults and Handover Recorded?

A variation is any change to the agreed job once work has started, such as an extra room or a different finish. Write it down, agree the price and approve it in writing before the work goes ahead.
Small faults, such as a missed edge or a thin patch, are found on a walk-round once the paint has dried. Agree in writing how they will be fixed before final handover. That way you are not left with a rushed finish once staff are back at their desks.
To compare quotes side by side, read how to compare decorator quotes.
Before you agree a start date, ask for a specification that names every area left out of the job.
To get a quote for redecorating a Cardiff office, call Primrose Decor on 029 2271 0084 before staff access is booked.
Get the Work Agreed in Writing
Agree the specification before staff access is booked